Concrete Strategies performed the structural concrete and foundation for this 7-story high-rise concrete hospital patient tower.

Constructed using a concrete frame, 214,000-square-feet of structural pan deck was supported on 92 drilled piers that were up to 84 inches in diameter. This project contained more than 1,234 tons of reinforced steel micro piles to support the existing building and approximately 12,000-cubic-yards of concrete with nearly 99,000-square-feet of vertical form face.

Key Facts

Project size:  214,000 SF

Services Provided

Elevated Structural Concrete
Foundation
Slab on Grade
Architectural
Paving
Site Concrete