Citi Processing Center

1 2 3 4 5 6 / 6

Concrete Strategies performed all of the tilt-up panels for this single-story, 170,000-square-foot processing center.

Using tilt-up panels, the tilt-up work on this attractive transaction services facility was finished in only 30 days on a fast-track schedule. There was 35,000-square-feet of brick inlay with sandwich panel insulation system used to achieve the corporate image that is compatible with the business park and in much less time than traditional masonry construction.

The single-story transaction and bill processing center was constructed using structural steel, three-quarter-inch brick embedded in structural concrete panels, insulated, tilt-up panel walls, and 25-foot clear-height ceilings, the processing center accommodates envelope stuffing and envelope-opening equipment. In addition, the building features 40,000-square-feet of management offices and an employee break room.

CLIENT

Citigroup

LOCATION

Urbandale, Iowa

SIZE

215,652 SF

KEY FACTS

  • Architect: Lamar Johnson Collaborative and M+H Architects

AWARDS

Tilt-Up Concrete Association – 2007 Tilt-Up Achievement Awards Office Division