Foundations

Concrete Strategies’ structural concrete, self-perform abilities range from simple, shallow spread footing foundation systems to high-rise, post-tension concrete towers.

In addition, Concrete Strategies has completed parking structures that were 5-levels below grade to parking structures 6-levels above grade, and post-tension superstructures, containing anywhere from 234 to 1,100 parking spaces. Working with owners and general contractors, we’re consistently successful in maximizing vehicle accessibility while maintaining safe and attractive environments for our clients.

Central Underground Garage at Washington University
St. Louis, Missouri
The three-level garage was constructed with 2-foot to 4-foot thick, 35-foot-tall perimeter walls, structural concrete columns and post-tension slabs at...
CenterPointe Hospital
St. Louis, Missouri
CenterPointe Hospital is a private psychiatric hospital serving the behavioral health needs of children, adolescents and adults in the metropolitan...
Missouri Baptist Hospital Medical Office Building
St. Louis, Missouri
Concrete Strategies is performing the complicated 2-story office construction over an existing parking garage. — Concrete Strategies is performing the complicated 2-story...
Missouri Baptist Medical Center West Pavilion
Town & Country, Missouri
Concrete Strategies performed the structural concrete and flatwork for this new 225,000-square-foot Patient Tower. — Large construction zone, phased parking removal and...
Missouri Baptist Medical Center Parking Garage
Town & Country, Missouri
Concrete Strategies performed the precast erection and civil concrete for this new 160,000-square-foot parking garage. — The garage consists of three levels...
Caterpillar Pacific Northwest
Spokane, Washington
Concrete Strategies constructed the tilt-up panels, foundations, flatwork and site utilities for this 550,000-square-foot distribution facility. — Concrete Strategies constructed the tilt-up...
Caterpillar Hydraulic Excavation Plant
Victoria, Texas
Concrete Strategies constructed the tilt-up panels, foundations, flatwork and site utilities for this 900,000-square-foot hydraulic excavation plant. — The facility provides sub-assembly,...
Casino Queen
East St. Louis, Illinois
Concrete Strategies constructed the tilt-up panels, foundations, basin slab and site concrete for this new 236,000-square-foot gaming facility. — There were 100...
Boone County Hospital
Columbia, Missouri
Concrete Strategies performed the structural concrete and foundation for this 7-story high-rise concrete hospital patient tower. — Constructed using a concrete frame,...
BJC Siteman Cancer Center
St. Peters, Missouri
Concrete Strategies performed the structural concrete and flatwork for this $7.2-million dollar expansion. — The 5,425-square-foot expansion includes a 2,400-square-foot multi-story glass...
BJC Corporate Headquarters
St. Louis, Missouri
Concrete Strategies performed the 5–story office steel structure connecting to load tilt up. — Project includes two sets of full height stairs,...
BioMed 21
St. Louis, Missouri
Concrete Strategies performed the structural concrete and flatwork for this bio-medical research building. — The university medical center project consisted of a...