Slab on Grade

Washington University – Loop Student Living Initiative
St. Louis, Missouri
Construction of a 72,000-square-foot underground concrete parking garage with 2 – 5 story 70,000-square-foot buildings constructed on top of the...
University of Missouri – Orthopedic Institute
Columbia, Missouri
Concrete Strategies performed the structural concrete for this five-story orthopedic center for the University of Missouri in Columbia, Missouri. — Concrete Strategies...
Umrath House at Washington University
St. Louis, Missouri
Concrete Strategies performed the structural concrete and flatwork packages for the new Umrath House on Washington University’s campus. — Concrete Strategies performed...
St. Louis Premium Outlets
Chesterfield, Missouri
Concrete Strategies performed the the tilt-up construction and flatwork for the St. Louis Premium Outlets. — Concrete Strategies performed the the tilt-up...
St. Louis County Health Campus
St. Louis, Missouri
Concrete Strategies performed the tilt-up, foundations and steel erection for the new 93,000-square-foot, 2-story health clinic, office and laboratory facility...
St. Louis College of Pharmacy
St. Louis, Missouri
This project was erected in 35 days. — This is a 9 story precast cladding project with 230 pieces that was erected...
Snow Way Garage at Washington University
St. Louis, Missouri
Concrete Strategies performed the structural concrete for this new 300-space parking structure at Washington University. — Concrete Strategies performed the structural concrete...
Shell Chemical LP Admin Building
Geismar, Louisiana
Concrete Strategies performed the foundations and flatwork package for the Geismar Plant. — Concrete Strategies performed the foundations and flatwork package for...
Scottrade Garage
Chesterfield, Missouri
Concrete strategies performed the precast concrete for this two level parking garage for at the Scottrade Maryville Campus. — Concrete strategies performed...
Reinsurance Group of America
Chesterfield, Missouri
The new headquarters facility for Reinsurance Group of America, Inc. is an interactive and connective workplace that accommodates the needs...
Prime Power
Fort Leonard Wood, Missouri
Concrete Strategies performed all concrete foundations, flatwork and site work for this new 70,000-square-foot Prime Power School Building. — Concrete Strategies performed...
Preston M. Green Hall at Washington University
St. Louis, Missouri
Concrete Strategies performed the structural concrete and flatwork for this new 70,000-square-foot state-of-the-art facility that provides additional research facilities crucial...