St. Louis County Health Campus
St. Louis, Missouri
Concrete Strategies performed the tilt-up, foundations and steel erection for the new 93,000-square-foot, 2-story health clinic, office and laboratory facility...
St. Louis College of Pharmacy
St. Louis, Missouri
This project was erected in 35 days. — This is a 9 story precast cladding project with 230 pieces that was erected...
Sterling Properties Garage Restoration
Frontenac, Missouri
The restoration included structural column, slab soffit, wall and beam repair, slab-on-grade repair, crack injection, and capping existing areaways with...
Snow Way Garage at Washington University
St. Louis, Missouri
Concrete Strategies performed the structural concrete for this new 300-space parking structure at Washington University. — Concrete Strategies performed the structural concrete...
SIUE Science Building
Edwardsville, Illinois
Concrete Strategies performed the precast erection on the six concrete frame building. — Concrete Strategies performed the precast erection on the six...
Shell Chemical LP Admin Building
Geismar, Louisiana
Concrete Strategies performed the foundations and flatwork package for the Geismar Plant. — Concrete Strategies performed the foundations and flatwork package for...
Scottrade Garage
Chesterfield, Missouri
Concrete strategies performed the precast concrete for this two level parking garage for at the Scottrade Maryville Campus. — Concrete strategies performed...
Rivercity Casino
Lemay, Missouri
Concrete Strategies provided the foundations for this 270,000-square-foot facility with a 90,000-square-foot casino. — Concrete Strategies provided the foundations for this 270,000-square-foot...
Reinsurance Group of America
Chesterfield, Missouri
The new headquarters facility for Reinsurance Group of America, Inc. is an interactive and connective workplace that accommodates the needs...
Procter & Gamble Manufacturing and Distribution Facility
Brigham, Utah
Concrete Strategies performed the foundations, flatwork and tilt-up walls for this 700,000-square-foot manufacturing and distribution center. — Concrete Strategies performed the foundations,...
Prime Power
Fort Leonard Wood, Missouri
Concrete Strategies performed all concrete foundations, flatwork and site work for this new 70,000-square-foot Prime Power School Building. — Concrete Strategies performed...
Preston M. Green Hall at Washington University
St. Louis, Missouri
Concrete Strategies performed the structural concrete and flatwork for this new 70,000-square-foot state-of-the-art facility that provides additional research facilities crucial...