Poplar Bluff Historic Depot Grand Staircase Restoration
Poplar Bluff, Missouri
Concrete Strategies constructed the new Grand Staircase at the Historic Poplar Bluff Depot. — Concrete Strategies constructed the new Grand Staircase at...
Pioneer Seed
New Madrid, Missouri
Concrete Strategies performed the foundations and flatwork for Pioneer Seed. — Concrete Strategies performed the foundations and flatwork for Pioneer Seed. A...
Payless ShoeSource Distribution Center
Brookville, Ohio
Concrete Strategies performed the flatwork for the 200,000-square-foot expansion project for this distribution facility in Brookville, Ohio. — Concrete Strategies performed the...
Pattonville High School
Maryland Heights, Missouri
Concrete Strategies performed tilt-up services and site improvements for Pattonville High School's campus. — Concrete Strategies performed tilt-up services and site improvements...
Page Avenue Bridge over River Des Peres
Pagedale, Missouri
Concrete Strategies performed a repair of existing abutment walls using shotcrete and replacement of abutment caps and superstructure replacement of...
On System Preventative Bridge Maintenance
St. Louis, Missouri
This project consisted of the restoration of 11 bridges in downtown St. Louis. — This project consisted of the restoration of 11...
Olmstead Dam
Olmstead, Illinois
This Concrete Strategies project was part of a $1-billion contract for the United States Army Core of Engineers to complete...
Novus Corporate HQ
St. Charles, Missouri
Concrete Strategies performed the foundations and flatwork packages for this 48,000-square-foot addition to this corporate office and research facility. — Novus International,...
Nestle A7
St. Louis, Missouri
Concrete Strategies performed the foundations, flatwork, precast erection, decorative sidewalks and loading dock renovations on this 7-story steel frame building. — Concrete...
MU Power Plant
Columbia, Missouri
Concrete Strategies installed a temporary coal conveying system to maintain continuous plant operation during construction. — Concrete Strategies installed a temporary coal...
Modot 3103 – Rte 50 over BNSF RR Overlay
St. Louis, Missouri
This was bridge work Lindbergh Blvd over BSNF Railroad. — This $750,000 project consisted of bridge deck rehab and overlay. Key Facts Client name: ...
Missouri Department of Transportation Rehab of Overpass
St. Louis, Missouri
The contract allowed a short window of time for closure of each of the bridges for removal of the existing...