AMC St. Charles 8

1 2 / 2

Construction included bracing to helical anchors and utilized a 275 ton crawler crane.

Erection of this movie theater occurred in 2014 and consisted of 167 precast wall panels, the heaviest of which panel was 52,000 pounds. Walls are double stacked precast concrete. Construction included bracing to helical anchors and utilized a 275 ton crawler crane.

CLIENT

AMC

LOCATION

St. Charles, Missouri