These production facilities in Terre Haute, Indiana, will house equipment for the production of lithium battery separators within approximately 1.4 million square feet of floor area. Concrete Strategies will self-perform the concrete foundations, flatwork, tilt-up wall panels, and concrete paving. At peak, construction is anticipated to reach approximately 400 workers.
The campus will help ENTEK scale its U.S. production, capable of supporting 1.4 to 1.6 million EVs annually by 2027. The new giga-scale lithium-ion battery separator operations will leverage ENTEK’s pioneering sustainable, state-of-the-art solvent extraction and recovery systems and processing techniques, and the company will work to utilize available renewable energy with a focus on a reduced carbon footprint. The company plans to break ground on the campus in 2023/24 and launch its Indiana operations between 2025-2027.