Parc Frontenac
St. Louis, Missouri
Concrete Strategies performed the structural concrete and foundations for this 150,000-square-foot pre-engineered metal building.
This 30-acre site development included over 12.5 acres of heavy-duty concrete paving and surface level parking lot. Features include 12.5 acres of heavy-duty concrete paving, ample surface level parking and a design that allows for future expansion up to 300,000-square-feet.