Parc Frontenac
St. Louis, Missouri
Concrete Strategies performed all concrete foundations, flatwork and site work for this new 70,000-square-foot Prime Power School Building. This slip formed a 20-foot wide by 1,500-foot long road to access the new job. Concrete Strategies installed numerous electrical generation equipment pads for training and 80,000-square-feet of roadway/parking lot paving.